Black Firs Primary School in Cheshire realised the benefits of Nomow and brought them in to remove the muddy bark and earth which had left their play area flooded & unsafe, and install over 700m2 of their brand new Play 365 artificial grass. Nomow also installed brand new drainage solutions eliminating the problem of floods, and installed the Shock Safe impact pads system, giving a 3m Critical Fall Height around the play equipment.
The Nomow technical team can assist with all aspects of product specification and pricing, design, landscaping and ground works.