Over 1000m2 of RonaDeck Resin Bound Surfacing was laid to the main A&E roadway entrance and turning circle at Basildon Hospital.
The entrance is heavily trafficked 24 hours a day so a durable surfacing was needed; the aggregate blends selected were Midnight and Terracotta.
Several tree pits were installed using RonaDeck Eco Tree Pit to protect the trees which enhance the area.